Health and safety are fundamental to responsible civil construction.

Elevation Six recognises that health and safety are fundamental to responsible civil construction. Work must be planned and carried out with appropriate hazard identification, risk assessment, site coordination, training, supervision and controls suited to the task.

Project-specific safety requirements will be reviewed before work starts, including the principal contractor’s site rules, applicable legislation, worker competency requirements and relevant work procedures.

Worker and pipe at a civil construction site

Planning and controls

Project requirements first

01

Health and safety planning

  • Project and task risk assessments
  • Site inductions, hazard controls and safe work procedures as required
  • Emergency arrangements, incident and near-miss reporting
  • Toolbox talks, communication and appropriate supervision
  • Competency checks and coordination with the principal contractor and other trades
02

High-risk work

Higher-risk activities must be planned and undertaken by appropriately competent and authorised personnel, with the necessary controls, permits, supervision and equipment. Any required authorisations and qualifications are confirmed before work is accepted.

03

Environmental management

  • Sediment and erosion controls
  • Dust and noise
  • Waste and material storage/disposal
  • Spill prevention and response
  • Waterway protection and site-specific requirements
04

Quality management

  1. Review drawings and specifications.
  2. Confirm scope and acceptance criteria.
  3. Identify inspections, tests and hold points.
  4. Check materials and workmanship.
  5. Record inspections and test results.
  6. Address non-conforming work and retain handover records.

Supporting documents

Draft templates for review

All documents below are labelled DRAFT — REVIEW AND APPROVAL REQUIRED. They must be adapted to applicable New Zealand legal, contractual and site-specific requirements before live use.

These templates do not represent completed safety records, worker training, equipment inspections, certifications, audits or an implemented management system. No external prequalification or certification is claimed.

Project requirements

Let’s review the scope and site requirements.

Discuss the project and the documentation required for contractor onboarding or tender review.

Contact Elevation Six